AK Steel Project/2005

AK Steel faced EPA mandated upgrades to its emission controls system and a rigid 6-month deadline for compliance. The steelmaker called on UGS to expeditiously:
  • Fabricate & erect all structural steel for BOF foundations, supports and ductwork
  • Fabricate & erect supporting electrical buildings
  • Install provided 16-ft. diameter emission ductwork and associated manifolds including the large Induced Draft Fan

UNITED Rigging Services placed the structural steel and 16-ft. diameter ductwork at roof-top levels more than 150 feet above grade.The entire project was completed on schedule.

 

 

 

UGS received a 2005 National Excellence Award for the AK Steel project at ceremonies of the ABC National Convention in Las Vegas. Honors are awarded annually, from hundreds of submissions nationwide.

 

 

 

 

 

 

 

 

 

 

 

PROJECTS LIST

 

Cargill Deodorizer Project

 

AK Steel Project/2005

 

 

 

 

 

 

 

 

 

     

9740 Near Drive, Cincinnati, Ohio 45246 800.633.9690 info@united-gs.com

© 2006 United Group Services. All Rights Reserved.

CALL TOLL-FREE 800.633.9690     EMAIL: info@united-gs.com